From
201-406-8916 Hyunwoo Jo
821 5th Ave
River Edge, NJ 07661
US
To
뉴욕성결교회
333 Arden Avenue
Staten Island, NY 10312
US
Date
August 3, 2022
Invoice Number
22427
Invoice Due
October 17, 2022
Invoice Total
$27,860.00
Balance
$0.00
  1. Service
    Price
    Amount

    # Payment History

    -$6000 Cash 8/3/2022

    -$16,200 Check #8115 10/22/22

    -$5,660 Check #8171 12/10/22

    $0
    $0
  2. LED Video Wall : 가로 11.5ft x 세로 6.45ft (3.5M x 2M, 158inch)

    P2.6 Pixel Pitch

    • P2.6 LED Video wall (3.5 x 2M) $19,950
    • Spare parts and Front maintenance tool included. ($2000 value) 
    • Electric Work $2,300
    • Support Materials $1400
    • Cable and Consumable Allowance  $500
    • System Design, Installation, Configuration, Setup and Training $ 4,500
    • 2 years parts and labor warranty
    • 3 month warranty service including remote support and replacement service.
    • Cash Payment Discount (-$1000) applied.
    • Additional Discount (-$500) applied.

    Parts & Specifications

    • Dimensions: 3.5M x 2M (11.6ft x 6.45ft, 158인치) – total 28 cabinets.
    • LED Lamp : NationStar SMD1515
    • Driver IC : FM6353
    • Serviceability: Front & Rear
    • Spare Parts : P2.6 module(12), Receiving card(1), Power Supply(1)
    • Refresh Rate: 3660 Hz
    • Control System : Nova VX4S
    • View Angle : H: 160° V: 160°
    • Weight : 8.75Kg(19.25lbs)/cabinet
    • Operating Life: 100,000 Hours
    • Certifications: ETL, CE, FCC, RoHS
    $27,060
    $27,060
  3. # Additional Work and Change

    1. Additional Steel Parts, Welding and Support Work $800 as of 11/26
    2. 새로운 LED 서포트의 구조변경에 관한 부분은 이 인보이스 결재후, 새로운 견적으로 진행하도록 하겠습니다. 감사하겠습니다.
    $800
    $800
Subtotal $27,860.00
Total $27,860.00
Payments $27,860.00
Balance $0.00

Notes

  • Permit costs not included
  • Sales Tax not included. Please provide tax exemption certificate if applicable.
프로젝트 스케쥴
  1. 파트주문 : 1차 결재후 입고까지 약 8~9weeks 소요 예정
  2. 전기작업 : 1~2일소요 예정
  3. 와이어링 작업, 설치, 셋업, 구성, 테스트 : 약 4일 소요 예정

감사하고, 변함없이 정확하고 성실하게 서비스를 제공하도록 하겠습니다.

Terms

결재스케쥴
  • 1차 결재 : 총액의 20%
  • 2차 결재 : 총액의 60% 주문기기가 배송시작시
  • 3차 결재 : 프로젝트 완료후 잔액 또는 추가/변경에 의한 최종잔액
자재비용 / 렌탈비용 
  1. 프로젝트를 진행하면서 발생하는 자재비용은 원가 플러스 10% 또는 최소 $50가 청구됩니다.
  2. 프로젝트에 필요한 LIFT, SCAFFOLDING 등의 렌탈은 비용에 10%가 청구됩니다.
주문변경 (Change Orders)
  1. 최초의 디자인과 견적서의 수락후 디자인, 제품, 공사의 변경은 오직 클라이언트의 대표자와 SOUND4U의 대표의  E-mail 과 정확한 Confirmation 을 통해서만 가능.
  2. 어떠한 구두의 (Verbal) 약속이나 변경은 그 유효성이 없음. 이것은 공사의 일관성을 지키고, 전달의 불확실성에서 오는  공사의 지연을 방지하기 위함.
전기 (Electric)
  1. 본사와 클라이어트간에 상의하여 진행함
배선 (Wiring)
  1. 오디오, 비디오, 조명, 전기선등은 기본적으로 벽외부로 하고, 상황에 따라  Cable Cover / Raceway 를 사용.
  2. 클라이언트가 In-Wall 배선을 요청하고 구조상 가능할 경우 진행함. 단, 벽의 홀, 패치, 페인팅 작업등이 병행될 경우 추가 비용 발생.
보증기간 (Warranty)
  1. SOUND4U 는 모든 프로젝트 공사가 끝나는 날로부터 1년간 하드웨어 설치에 관련된 부분을 보증계약에 따라 수리/보수함
  2. 잘못된 사용, 사용자 에러, 무리한 사용, 변경, 그리고 천재지변으로 인한 결함에 대한 수리/보수는 비용이 청구됨.
  3. 모든 제품의 보증은 각 제품회사의 보증기간에 따름. 단, 기기의 교체작업은 비용이 청구됨.
  4. 프로젝트 완성후 3개월후 현장 방문요청에는 서비스비용이 청구됨
  5. SOUND4U의 서비스 방문 요청은 회당 $200, 최초 1시간후 시간당 $75 추가,  또는 요청사안에 따라 청구됨.
Status Update
August 3, 2022 @ 3:27 pm

Status changed: Pending to Draft.

Updated
August 3, 2022 @ 3:31 pm

Invoice updated by hyunwoo.

Payment
August 3, 2022 @ 12:00 am

Admin PaymentPayment Total: $6,000.00

Status Update
August 3, 2022 @ 3:31 pm

Status changed: Pending to Outstanding Balance.

Updated
August 3, 2022 @ 3:31 pm

Invoice updated by hyunwoo.

Updated
August 3, 2022 @ 3:42 pm

Invoice updated by hyunwoo.

Updated
August 3, 2022 @ 3:47 pm

Invoice updated by hyunwoo.

Updated
August 3, 2022 @ 3:48 pm

Invoice updated by hyunwoo.

Updated
August 3, 2022 @ 3:49 pm

Invoice updated by hyunwoo.

Updated
August 5, 2022 @ 10:41 am

Invoice updated by hyunwoo.

Updated
August 5, 2022 @ 10:42 am

Invoice updated by hyunwoo.

Updated
August 5, 2022 @ 10:46 am

Invoice updated by hyunwoo.

Viewed
August 5, 2022 @ 10:46 am

Invoice viewed by 74.208.82.48 for the first time.

Viewed
October 2, 2022 @ 11:10 am

Invoice viewed by 64.124.8.44 for the first time.

Payment
October 22, 2022 @ 12:00 am

Admin PaymentPayment Total: $16,200.00

Status Update
October 22, 2022 @ 9:27 pm

Status changed: Pending to Outstanding Balance.

Updated
October 22, 2022 @ 9:27 pm

Invoice updated by hyunwoo.

Viewed
October 25, 2022 @ 7:46 am

Invoice viewed by 64.124.8.47 for the first time.

Updated
November 26, 2022 @ 6:19 pm

Invoice updated by hyunwoo.

Updated
November 26, 2022 @ 6:20 pm

Invoice updated by hyunwoo.

Updated
November 26, 2022 @ 6:22 pm

Invoice updated by hyunwoo.

Updated
November 26, 2022 @ 6:43 pm

Invoice updated by hyunwoo.

Updated
November 26, 2022 @ 6:44 pm

Invoice updated by hyunwoo.

Viewed
December 4, 2022 @ 4:01 am

Invoice viewed by 64.124.8.26 for the first time.

Updated
December 10, 2022 @ 10:33 pm

Invoice updated by hyunwoo.

Payment
December 10, 2022 @ 12:00 am

Admin PaymentPayment Total: $5,660.00

Status Update
December 10, 2022 @ 10:33 pm

Status changed: Pending to Paid.

Status Update
December 10, 2022 @ 10:33 pm

Status changed: Pending to Paid.

Updated
December 10, 2022 @ 10:33 pm

Invoice updated by hyunwoo.

Viewed
March 4, 2023 @ 10:01 pm

Invoice viewed by 43.130.122.222 for the first time.

Viewed
April 29, 2023 @ 8:43 pm

Invoice viewed by 64.124.8.192 for the first time.

Viewed
August 25, 2023 @ 10:52 pm

Invoice viewed by 64.124.8.24 for the first time.